Engineering and B2B projects: ERP and 1C exchange
Model: an engineering company with manufacturing and wholesale supply, two lines in one system. Operational accounting in MoySklad, bookkeeping stays in 1C, with document exchange between them.
A project model, not a completed job. The figures are a calculator estimate on typical industry values.
Assumptions
- Two lines give a factor of 1.14 on configuration work.
- 1C exchange is priced as a separate integration.
- Wholesale
- Manufacturing
Scope of work
- Manufacturing package with the two-line factor
- ABC/XYZ analytics
- 1C exchange — integration per price list
How we calculated
| Package «Manufacturing» | $1,350 |
| Multi-line factor ×1.14 | $1,539 |
| Separate modules: Bin-location storage, ABC/XYZ analytics | $570 |
| Total, rounded to the price step | $2,200 |
- Monthly gain
- $2,208
- Payback
- under a month
The calculation uses AIYNTOR assumptions: shares of time freed, losses prevented and enquiries recovered. This is not industry statistics — open “How we calculated” to see every value.
Calculate with your own figuresWhat it looks like in practice
All casesWe do not name clients. At a meeting we show the project and, with the client’s consent, introduce you.
Tell us what needs to be done
Describe the task and we will contact you during working hours.